Pipeline Construction.
As part of our robust pipeline construction operations, Troy has the capability of seamlessly managing up to eight mainline spreads simultaneously – installing pipe ranging from 2” to 48”. To date, Troy has completed numerous pipeline projects in excess of 100 miles of 36” and 42” diameter and a substantial number of smaller projects.
Beyond large-scale projects, Troy’s pipeline construction sector possesses the dexterity to complete smaller-scale projects with our trademark safety and compliance methodology.
Regardless of project size, Troy strives to be the pipeline constructor of choice, without exception.
- 2-inch to 48-inch Pipe
- 1 Mile to 500 Miles
- Horizontal Directional Drills
- Boring
- Automatic Welding
- Stick Welding
- In-house QA/QC
- Congested Corridors
- Rock Trenching
- Blasting
- Push/Wet Lay
- Shallow Water Barge Lay
- Ag Lands/Drain Tiles
- Hydrostatic Testing
- Heat Tracing
- HDPE Pipe
Projects
Bayou Bridge Pipeline Spread 1 and 2
Client:
Energy Transfer
Location:
Lake Charles, LA
106.5 miles of 24”
Pomelo Connector Pipeline Phase
Client:
Enbridge Pipelines
Location:
Robstown, TX
13 miles 30”
SK Pipeline
Client:
Kinder Morgan Tejas Pipeline
Location:
Angleton, TX
30 miles of 36”
GCX – Spread 1 – 36” Portion
Client:
Kinder Morgan Gulf Coast Express Pipeline
Location:
Midland, TX
42.8 miles of 36”
GCX – Spread 1 – 42” Portion
Client:
Kinder Morgan Gulf Coast Express Pipeline
Location:
Crane, TX
82.2 miles of 42”
Grand Prix South – Spread 1
Client:
Targa Resources Company
Location:
Hillsboro, TX
79 miles of 30”
Grand Prix South – Spread 2
Client:
Targa Resources Company
Location:
Buffalo, TX
77 miles of 30”
Grand Prix South – Spread 3
Client:
Targa Resources Company
Location:
Huntsville, TX
77 miles of 30”
Grand Prix South – Spread 4
Client:
Targa Resources Company
Location:
Baytown, TX
42 miles of 30”
Permian Highway – Spread 1
Client:
Kinder Morgan Permian Highway Pipeline
Location:
Crane, TX
112 miles 42”
Permian Highway – Spread 5
Client:
Kinder Morgan Permian Highway Pipeline
Location:
Gonzales, TX
86 miles 42”
Odessa to Stanton
Client:
Magellan Pipeline Company
Location:
Midland, TX
43 miles of 20”
Mentone Residue and Gathering Pipelines
Client:
Enterprise Texas Pipeline
Location:
Kermit, TX
57 miles of 6” to 36” (5 pipelines)
Lone Star Express – Spread 2
Client:
Energy Transfer Lone Star NGL Pipeline
Location:
Colorado City, CO
91.4 miles of 24”
EPIC – Corpus Christi
Client:
Epic
Location:
Corpus Christi, TX
11 miles of 30”
LEAP – Spread 1
Client:
Momentum LEAP Gas Gathering
Location:
Mansfield, LA
76.3 miles of 36”
LEAP – Spread 2
Client:
Momentum LEAP Gas Gathering
Location:
Deridder, LA
73.7 miles of 36”
Whistler Pipeline
Client:
WhiteWater Midstream
Location:
Crane, TX
82 miles 42” and 50 miles 36”
M2E3 – Segments 1 and 2
Client:
Energy Transfer
Location:
Midland, TX
143.3 miles of 36” crude pipeline
Tejas 520-100 Integrity Digs
Client:
Kinder Morgan Tejas Pipeline
Location:
Gonzales, TX
100 36” integrity digs
Mustang Replacement
Client:
Kinder Morgan Tejas Pipeline
Location:
Victoria, TX
22.3 miles of 36” (replacing and relay)
Acadian to Gillis Lateral
Client:
Enterprise Acadian Gas Pipeline
Location:
Deridder, LA
83.2 miles of 30”
DGD Pipeline
Client :
Howard Energy
Location:
Port Arthur, TX
2.1 miles 6″, 12″ and 20”
Texas City Hydrogen Pipeline
Client:
Air Products
Location:
Baytown, TX
9.8 miles 16”
Epic Rose
Client:
EnLink
Location:
Midland, TX
20 miles 16” including 1800’ of HDDs