Pipeline Construction.

As part of our robust pipeline construction operations, Troy has the capability of seamlessly managing up to eight mainline spreads simultaneously – installing pipe ranging from 2” to 48”. To date, Troy has completed numerous pipeline projects in excess of 100 miles of 36” and 42” diameter and a substantial number of smaller projects.

Beyond large-scale projects, Troy’s pipeline construction sector possesses the dexterity to complete smaller-scale projects with our trademark safety and compliance methodology.

Regardless of project size, Troy strives to be the pipeline constructor of choice, without exception.

  • 2-inch to 48-inch Pipe
  • 1 Mile to 500 Miles
  • Horizontal Directional Drills
  • Boring
  • Automatic Welding
  • Stick Welding
  • In-house QA/QC
  • Congested Corridors
  • Rock Trenching
  • Blasting
  • Push/Wet Lay
  • Shallow Water Barge Lay
  • Ag Lands/Drain Tiles
  • Hydrostatic Testing
  • Heat Tracing
  • HDPE Pipe

Projects

Bayou Bridge Pipeline Spread 1 and 2
Pomelo Connector Pipeline Phase
SK Pipeline
GCX – Spread 1 – 36” Portion
GCX – Spread 1 – 42” Portion
Grand Prix South – Spread 1
Grand Prix South – Spread 2
Grand Prix South – Spread 3
Grand Prix South – Spread 4
Permian Highway – Spread 1
Permian Highway – Spread 5
Odessa to Stanton
Mentone Residue and Gathering Pipelines
Lone Star Express – Spread 2
EPIC – Corpus Christi
LEAP – Spread 1
LEAP – Spread 2
Whistler Pipeline
M2E3 – Segments 1 and 2
Tejas 520-100 Integrity Digs
Mustang Replacement
Acadian to Gillis Lateral
DGD Pipeline
Texas City Hydrogen Pipeline
Epic Rose
Bayou Bridge Pipeline Spread 1 and 2

Client:
Energy Transfer

Location:
Lake Charles, LA

106.5 miles of 24”

 

Pomelo Connector Pipeline Phase

Client:
Enbridge Pipelines

Location:
Robstown, TX

13 miles 30”

SK Pipeline

Client:
Kinder Morgan Tejas Pipeline

Location:
Angleton, TX

30 miles of 36”

GCX – Spread 1 – 36” Portion

Client:
Kinder Morgan Gulf Coast Express Pipeline

Location:
Midland, TX

42.8 miles of 36”

GCX – Spread 1 – 42” Portion

Client:
Kinder Morgan Gulf Coast Express Pipeline

Location:
Crane, TX

82.2 miles of 42”

Grand Prix South – Spread 1

Client:
Targa Resources Company

Location:
Hillsboro, TX

79 miles of 30”

Grand Prix South – Spread 2

Client:
Targa Resources Company

Location:
Buffalo, TX

77 miles of 30”

Grand Prix South – Spread 3

Client:
Targa Resources Company

Location:
Huntsville, TX

77 miles of 30”

Grand Prix South – Spread 4

Client:
Targa Resources Company

Location:
Baytown, TX

42 miles of 30”

Permian Highway – Spread 1

Client:
Kinder Morgan Permian Highway Pipeline

Location:
Crane, TX

112 miles 42”

Permian Highway – Spread 5

Client:
Kinder Morgan Permian Highway Pipeline

Location:
Gonzales, TX

86 miles 42”

Odessa to Stanton

Client:
Magellan Pipeline Company

Location:
Midland, TX

43 miles of 20”

Mentone Residue and Gathering Pipelines

Client:
Enterprise Texas Pipeline

Location:
Kermit, TX

57 miles of 6” to 36” (5 pipelines)

Lone Star Express – Spread 2

Client:
Energy Transfer Lone Star NGL Pipeline

Location:
Colorado City, CO

91.4 miles of 24”

EPIC – Corpus Christi

Client:
Epic

Location:
Corpus Christi, TX

11 miles of 30”

LEAP – Spread 1

Client:
Momentum LEAP Gas Gathering

Location:
Mansfield, LA

76.3 miles of 36”

LEAP – Spread 2

Client:
Momentum LEAP Gas Gathering

Location:
Deridder, LA

73.7 miles of 36”

Whistler Pipeline

Client:
WhiteWater Midstream

Location:
Crane, TX

82 miles 42” and 50 miles 36”

M2E3 – Segments 1 and 2

Client:
Energy Transfer

Location:
Midland, TX

143.3 miles of 36” crude pipeline

Tejas 520-100 Integrity Digs

Client:
Kinder Morgan Tejas Pipeline

Location:
Gonzales, TX

100 36” integrity digs

Mustang Replacement

Client:
Kinder Morgan Tejas Pipeline

Location:
Victoria, TX

22.3 miles of 36” (replacing and relay)

Acadian to Gillis Lateral

Client:
Enterprise Acadian Gas Pipeline

Location:
Deridder, LA

83.2 miles of 30”

DGD Pipeline

Client :
Howard Energy

Location:
Port Arthur, TX

2.1 miles 6″, 12″ and 20”

Texas City Hydrogen Pipeline

Client:
Air Products

Location:
Baytown, TX

9.8 miles 16”

Epic Rose

Client:
EnLink

Location:
Midland, TX

20 miles 16” including 1800’ of HDDs